Permanent lighting is booking now for the holidays.

See permanent lighting
St. George Home Services

Plumbing · Bath and kitchen

Full bathroom remodel

A full bathroom, taken back and rebuilt. One crew, one schedule and one number.

One flat fee to find out what is wrong. You are told it on the phone before anyone is dispatched, and it comes off the job if you hire us. Read our Plain Terms

A finished bathroom with a tiled tub surround and a double vanity
A finished bath. Southern California.

What the work is

A full remodel means the room comes out: fixtures, finishes, and usually the vanity and the flooring. What goes back is decided before anything is demolished, in a written scope with an allowance for every item you are choosing.

The reason remodels go wrong is not usually the work. It is scope that was never written down and choices that were never made, so every decision becomes a delay and every delay becomes a change order. We write it down first.

The plumbing behind the wall is the part you will never see and the part that decides whether you do this again in eight years.

What is included

  • A written scope with allowances, agreed before demolition
  • Demolition and disposal
  • Rough plumbing, waterproofing, tile or panel, fixtures and trim
  • Blocking in the walls where you want it
  • Permits and inspections where the work requires them

What is not

  • Moving structural walls, unless quoted with an engineer's involvement
  • Electrical, which is our licensed electrical partner's, and quoted in
  • Repairing rot, damage or non-compliant framing found in demolition. Shown to you and quoted before it is done
  • Items above the agreed allowance

Before you pick fixtures, deal with the water

New cartridges, new aerators and a new glass panel go into the same water that furred up the old ones. If the house is not treated, a remodel is the moment to price that in.

The guide below quotes what the manufacturers themselves say about hardness.

Association approval

Whether your association has a say in work inside a unit depends on your documents, not on a general rule. The guide below sets out what they can and cannot require, and what a denial letter has to contain.

What to ask anyone quoting this, us included

  • Can I see the written scope and the allowances before demolition?
  • What happens, and what does it cost, if you find rot?
  • Who is on site every day, and what is the schedule?

What we can show you in writing

Every line traces to a document we read in full. The number after a sentence points to the research below.

  • Moving a drain in a slab house means cutting concrete. Before anything else we establish whether that slab is post-tensioned — plans, placards, perimeter pockets — and if any doubt is left, we treat it as post-tensioned.1
  • Round grouted pockets about 2 to 3 inches across, spaced around the perimeter of the slab, are the most reliable sign of a post-tensioned foundation. Not seeing them is not proof, because stucco, landscaping and patio pours cover them.1
  • If a tendon cannot be avoided, we stop. De-tensioning, splicing and re-stressing is a structural engineer's design carried out by a post-tensioning specialist. It is not plumber's work and we will not treat it as though it were.1

Where this comes from

Every line above traces to a document we read in full. The number after a sentence points to the research below; hover it for the section. If you find a line wrong, tell us and we will fix it and say so.

  1. Plumbing research, August 2026 Compiled from manufacturer warranty documents and installation manuals (A.O. Smith, Noritz, Rinnai, Rheem, Navien, Bradford White), the Battelle / Water Quality Research Foundation study, the Utah Code and DOPL rules. 1 section cited. Hover a number above for the section.

Read before you decide

The rest of bath and kitchen

The quote is the number. There is no second number.

Call (435) 850-0053

7 a.m. to 5 p.m., weekdays. Emergency calls answered any hour, every day.