St. George Home Services

Water-wise landscape · Hardscape

Paver walkway

A paver path built on the same base standard as a patio, with the fall taken away from the house.

One flat fee to find out what is wrong. You are told it on the phone before anyone is dispatched, and it comes off the job if you hire us. Read our Plain Terms

What the work is

A walkway is a narrow patio and fails the same ways: settlement at the edges, a dip where a downspout lands, and a fall that runs toward the house instead of away from it.

The base gets the same treatment. The edges get restraint on both sides, because a narrow surface has proportionally more edge than a patio does and edges are where movement starts.

What is included

  • Excavation and compacted base in lifts
  • Bedding, pavers, cuts and edge restraint both sides
  • Fall set away from the building
  • Joint sand and compaction
  • Photographs of every stage

What is not

  • Sealing
  • Steps or level changes, which are quoted separately
  • Lighting, unless quoted in
  • Drainage structures beyond surface fall

Where the downspouts land

A walkway that crosses a downspout discharge takes the whole roof's water at one point. That is worth designing around rather than discovering.

What to ask anyone quoting this, us included

  • Which way does it fall?
  • How deep is the base?
  • Is there edge restraint on both sides?

What we can show you in writing

Every line traces to a document we read in full. The number after a sentence points to the research below.

  • Ungrouted pavers and dry-set flagstone count as mulch inside the rebated area, poured concrete and mortared work are subtracted, and permeable artificial turf is accepted in lieu of mulch under the WCWCD program.1

Where this comes from

Every line above traces to a document we read in full. The number after a sentence points to the research below; hover it for the section. If you find a line wrong, tell us and we will fix it and say so.

  1. Landscape and hardscape research, August 2026 Compiled from Washington County Water Conservancy District program documents, its sample conservation easement and FAQ, Utah Water Savers, the 2023 USDA hardiness map, USU Extension, and St. George City Code, Title 10. 1 section cited. Hover a number above for the section.

Read before you decide

The rest of hardscape

The quote is the number. There is no second number.

Call (801) 680-6859

7 a.m. to 5 p.m., weekdays. Emergency calls answered any hour, every day.