St. George Home Services

Concrete coatings · Outside the house

Walkways and steps

The awkward work. Edges, risers, nosings, curves and landings, most of it cut in by hand because no machine reaches it.

One flat fee to find out what is wrong. You are told it on the phone before anyone is dispatched, and it comes off the job if you hire us. Read our Plain Terms

A coated apron in tan, black and white flake photographed from ground level, meeting a plain concrete sidewalk at the top of the frame
A coated apron running out to the sidewalk.

What the work is

Walkways and steps are priced by difficulty rather than by area. A straight run of path is quick. A curved entry with three risers, a landing and a stone border takes a day and most of it is hand work with a small grinder.

Steps get a texture, always. A riser and a nosing are where a smooth coating does the most harm and a coarse broadcast does the most good, and we do not offer a choice about it on a step.

The masking is a real part of the job here, because walkways run right up against stone, stucco, planting beds and front doors. Expect the entry to be taped off and out of use for the day the work is done, and expect to be told which day that is in advance.

This is also the work where the edges show. Look at the finished line where the coating meets the stone, not at the middle of the path.

What is included

  • Hand grinding the edges, risers, nosings and curves
  • A textured finish on every step, as standard
  • Masking the adjoining stone, stucco, planting and doors
  • Closing the entry for the day and telling you beforehand
  • Cutting a clean termination line where the coating stops

What is not

  • A smooth finish on a step or a riser
  • Rebuilding a step that is broken or settling. Repair comes first and is its own quote
  • Keeping the front door in use while the entry is coated. It cannot be both

What to ask anyone quoting this, us included

  • How are the edges and risers being prepared?
  • What does the finished line look like where it meets the stone?
  • Which day is my front door out of use?

What we can show you in writing

Every line traces to a document we read in full. The number after a sentence points to the research below.

  • Concrete substrates must be mechanically prepared to remove cement laitance, existing coatings and curing compounds, and to achieve a profile that is clean, dry and free of dirt, grease and oil. Diamond grinders create that profile and remove high spots and coatings; shot blasting is described as the industry standard for surface preparation of concrete.1

Where this comes from

Every line above traces to a document we read in full. The number after a sentence points to the research below; hover it for the section. If you find a line wrong, tell us and we will fix it and say so.

  1. Concrete coatings research, September 2026 Compiled from ICRI Guideline 310.2R-2013 on concrete surface preparation, the ASTM moisture test standards F2170, F1869 and D4263, ACI 302.2R and NRMCA CIP 29 on slabs and vapor retarders, Sika's published surface preparation guide, Sherwin-Williams product literature on polyaspartic chemistry, and the Utah Geological Survey and Utah DEQ material already cited in the environment research. 1 section cited. Hover a number above for the section.

The rest of outside the house

The quote is the number. There is no second number.

Call (801) 680-6859

7 a.m. to 5 p.m., weekdays. Emergency calls answered any hour, every day.